Friday, April 23, 2010
Construction at the Firehouse
You might notice some construction in the rear parking area at the firehouse. The Town is having a 1000 gallon oil/water separator installed to comply with DEP requirements. This oil/water separator will filter the waste water we generate when we wash the fire apparatus.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment